What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 31 | £27.39 |
| 2 | Jamesfield 1 | £24.25 |
| 3 | Roaring Hill | £22.64 |
| 4 | UK Power Reserve #08 | £21.73 |
| 5 | Whitelee 1 | £21.73 |
| 6 | UKPR MANW | £21.72 |
| 7 | UKPR East Mids | £21.60 |
| Region | £/MWh |
|---|---|
| North Scotland | £21.9 |
| South Scotland | £21.2 |
| Merseyside and North Wales | £20.4 |
| Southern | £18.3 |