What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 70 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £64.00 |
| 2 | Staythorpe 1 | £62.00 |
| 3 | Staythorpe 3 | £62.00 |
| 4 | Staythorpe 4 | £60.75 |
| 5 | Shoreham | £59.00 |
| 6 | Dong Severn Ut 10 | £57.83 |
| 7 | Dong Severn Ut 20 | £53.72 |
| Region | £/MWh |
|---|---|
| South Western | £35.3 |
| Eastern | £32.5 |
| South Eastern | £31.8 |
| North Western | £30.5 |
| Midlands | £30.5 |
| South Wales | £27.7 |