What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £52.18 |
| 2 | West Burton B 1 | £41.80 |
| 3 | Kings Lynn A | £28.00 |
| 4 | Octopus Energy #01 | £27.97 |
| 5 | Dong Severn Ut 20 | £27.23 |
| 6 | Bulphan Fen | £24.54 |
| 7 | Rocksavage | £24.50 |
| Region | £/MWh |
|---|---|
| Eastern | £22.7 |
| South Western | £20.6 |