What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 46 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 4 | £13.67 |
| 2 | West Burton B 1 | £12.00 |
| 3 | Drax | £10.71 |
| 4 | Unit 3 | £10.65 |
| 5 | SOUTH HUMBER BANK P/S | £10.25 |
| 6 | GridBeyond L0DN | £9.10 |
| 7 | GridBeyond L0EN | £9.10 |
| Region | £/MWh |
|---|---|
| South Scotland | £3.8 |
| Southern | £3.1 |