What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £45.24 |
| 2 | Optimo Energy T01N | £35.46 |
| 3 | GridBeyond L0DN | £29.14 |
| 4 | GridBeyond L0EN | £29.14 |
| 5 | Staythorpe 1 | £28.88 |
| 6 | BGI Trading #1 | £28.04 |
| 7 | Carrington Ltd - 2 | £26.33 |
| Region | £/MWh |
|---|---|
| North Western | £26.0 |
| North Scotland | £22.5 |
| Eastern | £20.1 |
| South Western | £20.1 |