What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 39 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £24.42 |
| 2 | Tebworth Park | £10.64 |
| 3 | Dong Severn Ut 20 | £8.31 |
| 4 | Tye Lane | £5.71 |
| 5 | GridBeyond L0EN | £5.12 |
| 6 | EDF Aggregated Unit 05 | £4.00 |
| 7 | Buxton | £3.67 |
| Region | £/MWh |
|---|---|
| Eastern | £10.4 |
| North Western | £3.6 |
| South Eastern | £3.3 |
| Midlands | £3.2 |