What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | UKPR East Mids | £3.00 |
| 2 | Thame Road | £2.96 |
| 3 | Contego | £2.85 |
| 4 | UKPR S East | £2.60 |
| 5 | UKPR MANW | £2.57 |
| 6 | UK Power Reserve #08 | £2.50 |
| 7 | SUNDON | £2.24 |
| Region | £/MWh |
|---|---|
| South Eastern | £2.9 |
| Eastern | £2.5 |