What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Bloxwich | £24.56 |
| 2 | Coupar | £24.56 |
| 3 | Arbroath | £24.56 |
| 4 | Shilton Lane | £24.56 |
| 5 | Dong Severn Ut 20 | £17.93 |
| 6 | GridBeyond L0DN | £17.91 |
| 7 | GridBeyond L0EN | £17.91 |
| Region | £/MWh |
|---|---|
| Midlands | £24.6 |
| North Scotland | £24.6 |
| South Scotland | £22.8 |
| Merseyside and North Wales | £15.8 |
| Eastern | £15.3 |