What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Capenhurst | £4.39 |
| 2 | Dong Severn Ut 20 | £2.75 |
| 3 | BESS Holdco 2 EN7H | £1.59 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £4.4 |
| Southern | £1.6 |
| North Western | £0.0 |
| South Eastern | £0.0 |