What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 54 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £10.75 |
| 2 | Cruachan | £8.47 |
| 3 | West Burton B 2 | £8.43 |
| 4 | Pillswood 2 | £8.16 |
| 5 | Pillswood 1 | £8.12 |
| 6 | GridBeyond L0DN | £8.03 |
| 7 | GridBeyond L0EN | £8.03 |
| Region | £/MWh |
|---|---|
| Yorkshire | £8.1 |