What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 1 accepted unit with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tollgate | £13.52 |
| 2 | Immingham CHP | £9.82 |
| 3 | Centrica Business Solutions S05L | £7.79 |
| 4 | Marchwood | £7.01 |
| Region | £/MWh |
|---|---|
| Eastern | £13.5 |