What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Peterhead Block 1 | £6.05 |
| 2 | Staythorpe 2 | £5.63 |
| 3 | THURROCK STORAGE #3 | £4.67 |
| 4 | THURROCK STORAGE #2 | £4.65 |
| 5 | Pillswood 2 | £4.64 |
| 6 | Unit 3 | £3.45 |
| Region | £/MWh |
|---|---|
| South Eastern | £4.7 |
| Yorkshire | £4.6 |