What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Capenhurst | £8.46 |
| 2 | Pillswood 2 | £7.00 |
| 3 | Wormald Green | £6.32 |
| 4 | EDFE Aggregate S Eng 02 | £4.47 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £8.5 |
| Yorkshire | £7.0 |
| Northern | £6.3 |