What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 1 | £10.88 |
| 2 | Staythorpe 3 | £10.88 |
| 3 | Staythorpe 4 | £10.13 |
| 4 | Unit 3 | £8.99 |
| 5 | Unit 1 | £8.92 |
| 6 | BMUid for Sutton Bridge | £8.60 |
| 7 | Carrington Ltd - 2 | £6.81 |
| Region | £/MWh |
|---|---|
| Eastern | £5.4 |