What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Peterhead Block 1 | £20.62 |
| 2 | Marchwood | £20.03 |
| 3 | Dinorwig | £14.86 |
| 4 | Dollymans | £12.46 |
| 5 | THURROCK STORAGE #2 | £12.26 |
| 6 | THURROCK STORAGE #3 | £12.00 |
| 7 | ClayTye Farm 2 | £10.47 |
| Region | £/MWh |
|---|---|
| South Eastern | £12.1 |
| Eastern | £10.7 |
| Northern | £8.2 |