What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 3 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | F & S Energy #02 | £5.12 |
| 2 | Sizing John | £4.09 |
| 3 | Tebworth Park | £4.00 |
| Region | £/MWh |
|---|---|
| Eastern | £4.0 |