What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 1 | £24.50 |
| 2 | Staythorpe 2 | £24.50 |
| 3 | Staythorpe 3 | £24.50 |
| 4 | Ferrybridge-1 | £17.46 |
| 5 | BGI Trading #1 | £13.94 |
| 6 | Ferrybridge-2 | £13.56 |
| 7 | Limejump Energy #02 | £11.77 |
| Region | £/MWh |
|---|---|
| North Western | £13.9 |
| South Eastern | £11.2 |