What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 37 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £33.63 |
| 2 | Staythorpe 1 | £28.63 |
| 3 | Clachan G1 | £13.71 |
| 4 | Sloy G1 | £13.71 |
| 5 | Sloy G2 | £13.71 |
| 6 | Sloy G3 | £13.71 |
| 7 | Sloy G4 | £13.71 |
| Region | £/MWh |
|---|---|
| Eastern | £10.7 |
| South Scotland | £7.2 |