What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 56 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 21 | £122.48 |
| 2 | Pembroke 31 | £122.48 |
| 3 | Unit 2 | £122.48 |
| 4 | Ferrybridge-2 | £121.32 |
| 5 | Ferrybridge-1 | £100.54 |
| 6 | SSE Energy Supply #01 | £89.93 |