What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £7.14 |
| 2 | F & S Energy #03 | £7.04 |
| 3 | Coryton | £5.26 |
| 4 | Spalding | £4.94 |
| 5 | Immingham CHP | £4.34 |
| Region | £/MWh |
|---|---|
| Eastern | £7.1 |