What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £12.10 |
| 2 | Keadby-2 Main | £11.89 |
| 3 | SUNDON | £11.71 |
| 4 | BREDBURY | £11.18 |
| 5 | Pivot Coventry | £10.71 |
| 6 | EDF Aggregated Unit 05 | £10.60 |
| 7 | Grain | £9.74 |
| Region | £/MWh |
|---|---|
| Eastern | £11.8 |
| North Western | £11.2 |
| Midlands | £10.1 |
| South Eastern | £7.4 |