What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | UKPR MANW | £27.88 |
| 2 | UKPR S East | £27.88 |
| 3 | UKPR East Mids | £27.86 |
| 4 | Nursling | £22.08 |
| 5 | BREDBURY | £22.06 |
| 6 | Pivot Coventry | £21.30 |
| Region | £/MWh |
|---|---|
| Southern | £22.1 |
| North Western | £22.1 |
| Midlands | £21.3 |