What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | West Burton B 2 | £2.06 |
| 2 | Grain | £1.70 |
| 3 | Broadditch | £1.60 |
| 4 | SSE Energy Supply #01 | £1.57 |
| 5 | ClayTye Farm 2 | £1.55 |
| 6 | Tye Lane | £1.36 |
| 7 | BREDBURY | £1.30 |
| Region | £/MWh |
|---|---|
| South Eastern | £1.6 |
| Eastern | £1.3 |
| North Western | £1.3 |
| South Western | £1.2 |
| Midlands | £1.2 |