What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £14.24 |
| 2 | Unit 2 | £8.08 |
| 3 | Carrington Ltd - 2 | £7.25 |
| 4 | SUNDON | £4.61 |
| Region | £/MWh |
|---|---|
| Eastern | £4.6 |