What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 49 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SUNDON | £67.14 |
| 2 | Larks Green | £67.00 |
| 3 | Pivot Coventry | £65.33 |
| Region | £/MWh |
|---|---|
| Eastern | £67.1 |
| South Western | £67.0 |
| Midlands | £65.3 |