What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 2 | £2.80 |
| 2 | UKPR S East | £0.93 |
| 3 | Brigg | £0.88 |
| 4 | Carrington Ltd - 2 | £0.82 |
| 5 | Centrica Business Solutions S05L | £0.78 |
| 6 | Wishaw | £0.77 |
| 7 | Roosecote | £0.75 |
| Region | £/MWh |
|---|---|
| Yorkshire | £0.9 |
| South Scotland | £0.8 |
| North Western | £0.8 |