What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 3 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £7.67 |
| 2 | Pillswood 1 | £5.69 |
| 3 | Pillswood 2 | £5.69 |
| Region | £/MWh |
|---|---|
| Yorkshire | £5.7 |