What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £2.08 |
| 2 | Tebworth Park | £1.94 |
| 3 | F & S Energy #03 | £1.89 |
| Region | £/MWh |
|---|---|
| Eastern | £2.0 |