What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £0.38 |
| 2 | Grain | £0.33 |
| 3 | Lakeside | £0.33 |
| 4 | Monk Fryston | £0.33 |
| 5 | Ocker Hill | £0.30 |
| 6 | Swangate | £0.28 |
| 7 | Marchwood | £0.28 |
| Region | £/MWh |
|---|---|
| Midlands | £0.3 |
| Yorkshire | £0.3 |
| North Western | £0.2 |