What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 43 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Monk Fryston | £5.45 |
| 2 | Lakeside | £5.45 |
| 3 | Ocker Hill | £5.07 |
| 4 | Pillswood 2 | £4.76 |
| 5 | Immingham CHP | £4.74 |
| 6 | Statkraft Markets #09 | £4.69 |
| 7 | Drax | £4.68 |
| Region | £/MWh |
|---|---|
| Yorkshire | £5.1 |
| Midlands | £5.1 |
| South Eastern | £4.6 |
| Northern | £4.3 |