What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £6.52 |
| 2 | BREDBURY | £5.48 |
| 3 | Pivot Bustleholme | £5.06 |
| 4 | Pivot Coventry | £3.89 |
| Region | £/MWh |
|---|---|
| Eastern | £6.5 |
| North Western | £5.5 |
| Midlands | £4.7 |