What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Peterhead Block 1 | £538.00 |
| 2 | Exergy Solutions E00E | £459.29 |
| 3 | Damhead Creek | £438.12 |
| 4 | Coryton | £403.13 |
| 5 | Centrica Business Solutions S05L | £251.97 |