What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 60 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £90.97 |
| 2 | Unit 1 | £90.74 |
| 3 | SOUTH HUMBER BANK P/S | £85.00 |
| 4 | Exergy Solutions E00E | £83.19 |
| 5 | Damhead Creek | £81.50 |
| 6 | Drax Energy Solutions #01 | £79.88 |
| 7 | Coryton | £75.30 |