What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Brigg | £27.31 |
| 2 | Damhead Creek | £25.27 |
| 3 | Dong Severn Ut 10 | £23.52 |
| 4 | Dinorwig | £17.96 |
| 5 | GridBeyond L0DN | £17.96 |
| 6 | Flexitricity #03 | £17.96 |
| Region | £/MWh |
|---|---|
| Yorkshire | £27.3 |