What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 26 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £26.50 |
| 2 | Unit 2 | £25.92 |
| 3 | Brook Farm | £10.54 |
| 4 | EDF Energy F01C | £10.53 |
| 5 | BREDBURY | £7.71 |
| 6 | ZENOBE BLACKHILLOCK #3 | £6.95 |
| 7 | Kilmarnock South | £5.07 |
| Region | £/MWh |
|---|---|
| Eastern | £10.5 |
| North Western | £7.7 |
| North Scotland | £6.3 |
| South Scotland | £5.1 |