What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SOUTH HUMBER BANK P/S | £13.43 |
| 2 | Keadby-2 Main | £13.43 |
| 3 | Tebworth Park | £13.25 |
| 4 | Sizing John | £13.18 |
| 5 | Shoreham | £13.11 |
| 6 | Immingham CHP | £12.75 |
| 7 | Dong Severn Ut 20 | £11.52 |
| Region | £/MWh |
|---|---|
| Eastern | £13.2 |