What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £6.92 |
| 2 | Coryton | £6.80 |
| 3 | Ocker Hill | £6.61 |
| 4 | Lakeside | £6.58 |
| 5 | Carnegie Road 1 | £5.73 |
| Region | £/MWh |
|---|---|
| Midlands | £6.6 |
| Yorkshire | £6.6 |
| Merseyside and North Wales | £5.7 |