What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £9.29 |
| 2 | Coryton | £9.18 |
| 3 | Lakeside | £9.08 |
| 4 | Cottam Development Centre | £8.88 |
| 5 | Ocker Hill | £8.59 |
| 6 | Pillswood 1 | £8.54 |
| 7 | THURROCK STORAGE #3 | £8.50 |
| Region | £/MWh |
|---|---|
| Yorkshire | £9.1 |
| South Eastern | £8.5 |
| Midlands | £8.4 |
| Merseyside and North Wales | £8.0 |