What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £68.56 |
| 2 | Cottam Development Centre | £64.56 |
| 3 | Unit 2 | £62.60 |
| 4 | Shoreham | £62.00 |
| 5 | Immingham CHP | £59.79 |
| 6 | THURROCK STORAGE #1 | £56.80 |
| 7 | Lakeside | £55.39 |
| Region | £/MWh |
|---|---|
| Yorkshire | £55.4 |
| South Eastern | £55.1 |
| Midlands | £50.0 |