What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 4 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Holes Bay | £105.25 |
| 2 | Farnham | £105.23 |
| 3 | Exergy Solutions E00E | £99.25 |
| 4 | Pivot Coventry | £82.87 |
| 5 | Pivot Bustleholme | £82.87 |