What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Shoreham | £6.65 |
| 2 | BMUid for Sutton Bridge | £6.63 |
| 3 | Lakeside | £4.92 |
| 4 | BREDBURY | £4.88 |
| 5 | F & S Energy #03 | £4.79 |
| 6 | Danske Commodities A/S K01G | £4.79 |
| 7 | Unit 3 | £4.61 |
| Region | £/MWh |
|---|---|
| Yorkshire | £4.7 |
| Merseyside and North Wales | £3.9 |
| North Western | £3.8 |
| Midlands | £3.7 |