What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £14.19 |
| 2 | THURROCK STORAGE #1 | £10.00 |
| 3 | SSE Energy Supply #01 | £5.34 |
| 4 | Dong Severn Ut 10 | £4.95 |
| 5 | Sizing John | £4.93 |
| 6 | Wormald Green | £4.31 |
| 7 | Immingham CHP | £3.17 |
| Region | £/MWh |
|---|---|
| South Eastern | £8.5 |
| Eastern | £4.9 |
| Northern | £4.3 |