What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £6.54 |
| 2 | ClayTye Farm 2 | £4.25 |
| 3 | SUNDON | £4.24 |
| 4 | Unit 3 | £4.00 |
| 5 | Carnegie Road 1 | £4.00 |
| 6 | Statkraft Markets #4 | £3.96 |
| 7 | THURROCK STORAGE #3 | £3.91 |
| Region | £/MWh |
|---|---|
| Eastern | £4.2 |
| Merseyside and North Wales | £4.0 |
| South Eastern | £3.8 |
| South Wales | £3.6 |