What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £2.35 |
| 2 | Rocksavage | £2.28 |
| 3 | Exergy Solutions E00E | £2.23 |
| 4 | Sizing John | £2.16 |
| Region | £/MWh |
|---|---|
| Eastern | £2.2 |