What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £59.37 |
| 2 | Enfield Centre Ltd BMU1 | £57.59 |
| 3 | Marchwood | £45.54 |
| 4 | Drax | £38.62 |
| 5 | Centrica Business Solutions S05L | £32.56 |
| 6 | Exergy Solutions E00E | £24.75 |
| 7 | Dinorwig | £20.43 |