What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £75.88 |
| 2 | Grain | £74.75 |
| 3 | Enfield Centre Ltd BMU1 | £73.80 |
| 4 | Immingham CHP | £67.85 |
| 5 | Marchwood | £59.66 |
| 6 | Drax | £53.82 |
| 7 | Drax | £51.55 |