What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £0.96 |
| 2 | EDFE Aggregate S Eng 02 | £0.87 |
| 3 | SUNDON | £0.60 |
| 4 | Coryton | £0.37 |
| 5 | Enfield Centre Ltd BMU1 | £0.19 |
| Region | £/MWh |
|---|---|
| Eastern | £0.6 |