What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £4.32 |
| 2 | Centrica Business Solutions S05L | £4.24 |
| 3 | BREDBURY | £3.33 |
| 4 | Ocker Hill | £3.09 |
| 5 | Swangate | £2.91 |
| 6 | Pivot Coventry | £2.05 |
| 7 | Pivot Bustleholme | £1.65 |
| Region | £/MWh |
|---|---|
| Yorkshire | £3.9 |
| North Western | £3.3 |
| Midlands | £1.9 |