What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | F & S Energy #02 | £7.31 |
| 2 | SSE Energy Supply #01 | £5.15 |
| 3 | Pillswood 1 | £4.84 |
| 4 | Unit 3 | £4.50 |
| 5 | Wormald Green | £2.96 |