What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #3 | £4.20 |
| 2 | Great Yarmouth | £3.50 |
| 3 | SOUTH HUMBER BANK P/S | £2.40 |
| 4 | Sizing John | £2.34 |
| 5 | West Burton B 2 | £2.32 |
| 6 | F & S Energy #03 | £2.30 |
| 7 | Coryton | £2.29 |
| Region | £/MWh |
|---|---|
| South Eastern | £4.2 |
| Eastern | £2.3 |